Government of New Brunswick
Date Project Registered Project Number Proponent Description of the Project Location (county) Assigned Project Manager Status Date of Decision
2019/02/12 1515 Fundy Regional Service Commission The proponent proposes to extract clay and aggregate stone to provide construction materials for future landfill disposal cells and general maintenance projects at the Crane Mountain Landfill Saint John Rachelle Voisine Certificate of Determination Issued
   2020/10/09
2019/02/22
1516 Gourmet Chef Packers The proponent is proposing to determine the sustainable yield of a groundwater well for their agricultural operation in the Local Service District of Shediac Bridge-Shediac River. Westmorland Pierre Doucet Certificate of Determination Issued
2019/08/02
2019/03/28 1517 Department of Transportation and Infrastructure The proponent is proposing to construct and operate a new international bridge over the Saint John River between the City of Edmundston, NB and the Town of Madawaska, ME and to remove the existing bridge.
Madawaska Rachelle Voisine Certificate of Determination Issued
2020/12/20
2019/03/29 1518

Village de Eel River Crossing Dundee

Water Supply Source

The proposed project involves the development of a groundwater production well that would be used to supplement/replace the water supply for the Village of Eel River Crossing Dundee.

Restigouche Shawn Hamilton Determination review in progress  
2019/04/17 1519 Elmtree Resources Limited The proposed project involves the development of two open pit quarries for the extraction of limestone.
Restigouche Sheila Goucher Awaiting additional information
 
2019/04/30 1520 Thermalite Products Inc
The proponent is proposing to determine the sustainable yield of groundwater wells supplying potable and process water to their existing manufacturing facility in Cap-Pelé, NB.
Westmorland Justin Chase Certificate of Determination Issued
2019/11/20
2019/05/13 1521 Regional Municipality of Tracadie The proponent proposes to upgrade the Tracadie Lagoon by raising the dikes, changing the outfall location, and other modifications

Gloucester

Patrick Mbaya Certificate of Determination Issued
2022/07/15
2019/05/13 1522 Agropur Dairy Cooperative The proponent is proposing to determine the sustainable yield of groundwater wells for its dairy plant near Sussex, NB. Kings Shawn Hamilton Certificate of Determination Issued
2021/06/09
2019/05/30 1523 Premier Horticulture Ltée.
The proponent is proposing to harvest peat by developing Bog # 215, near Jardineville, which will include the construction of an access road, sedimentation ponds, and drainage channels. Kent Pierre Doucet Certificate of Determination Issued
2022/05/16
2019/06/06
1524
Premier Tech Horticulture
The proposed project involves the development of a 119-hectare peat harvesting operation of peat bog # 12 - Semiwagan. Project activities will include ditching, construction of access roads, two sedimentation ponds and the collection of the peat resource. The harvested peat would be transported to an existing processing facility in Rexton.
Northumberland
Pierre Doucet
Certificate of Determination Issued
2022/05/16
2019/05/31 1525  McGraw Seafood (2008) Inc. The proponent is proposing to determine the sustainable yield of groundwater wells to their existing fish processing facility in Tracadie-Sheila, NB. Gloucester Pierre Doucet Certificate of Determination Issued
2020/10/14
2019/07/17 1526 Violet Solar Farm
The proposed project involves the construction of solar farm with a capacity of 10 Mega Watts. The proposed project is located in Brunswick Mills, near Bathurst.
Gloucester Shawn Hamilton
Certificate of Determination Issued
2020/02/10
2019/07/17 1527

Étang Ruisseau Bay Ltée

Water Source Supply Assessment

Open Well Geothermal System – The oyster facility is proposing to convert to a geothermal heat source which will reduce power consumption. Gloucester Shawn Hamilton Certificate of Determination Issued
2020/05/15
2019/07/25 1528

Pokeshaw Black Rock Wind Limited Partnership

The proposed 20 MW wind energy project involves the construction of five wind turbines as well as the development of supporting infrastructure, including roadways and collector lines. The proposed project is located approximately 2 km southeast of Pokeshaw, NB on privately owned land. Gloucester Shawn Hamilton Certificate of Determination Issued
 
2019/08/19
1529 Gilbert M. Rioux et Fils Ltée The proponent is proposing to recycle out of province beverage products not sold to market at the Grand Falls location. Products will vary from pop, energy drink, juice and beer.
Victoria Shawn Hamilton Certificate of Determination Issued
2019/10/25
2019/09/10 1530 RC Northern Organics Inc.
The proponent is proposing to develop an organic, land-based Atlantic salmon hatchery on the site of a former fish processing facility in Grande-Anse.
Gloucester Pierre Doucet Awaiting additional information  
2019/09/18
1531
Chaleur Ventus Wind Project The proposed 20 MW wind energy project involves the construction of five wind turbines as well as the development of supporting infrastructure, including roadways, a collector system, and a substation. The proposed project is located on Crown Land as well as privately owned land south of Route 303 in Anse-Bleue, Gloucester County, NB.
Gloucester
Pierre Doucet
Determination review in progress  
2019/11/13 1532 New Brunswick Power Corporation – 138 kV Reliability for Fredericton South. 
The proponent is proposing to construct and operate a new 16.1 km-long, 138 kV transmission line between the Rainsford Substation in Fredericton and the Mactaquac Terminal near the Mactaquac Generation Station.   York Shawn Hamilton Certificate of Determination Issued
2021/02/11
2019/12/16 1533 City of Dieppe The proponent is proposing to replace an existing aboiteau structure with a new aboiteau structure, to raise an existing dyke, and to conduct other related activities in the Fox Creek area.
Westmorland Rachelle Voisine Determination review in progress  
2019/12/19 1534 Village of Alma The proponent is proposing to develop a new municipal groundwater well.
Albert Rachelle Voisine Determination review in progress